Current Projects (2013)

The photo on the left is of the Generator control panel. It is where you would switch from line power to generator power it is done automatically. When the power is down for a long period of time. The green generator (middle picture) in the picture cost $265,000. It was purchased so that it can operate the entire facility for two days without refueling.

The three pumps in the on the top right were installed at a cost of $82,000.00. The tan pipe pictures (bottom) is a filter to the waste line. The valve in the line opens and the filter valve closes if the filter is not working up to standards.  It does not allow any water to enter the clearwell until it is corrected. The clearwell is a 185,000 gallon tank under the filters where the water is chlorinated and pumped out to our customers. All these components were installed in 2013.(Click a picture to enlarge)

 

 

Water Rate Tables

Below is a yearly list of the past water rate tables as approved by the St. Charles Mesa Water District Board:
2018  2017  2016  2015  2014

Board Meetings

The SCMWD Board meetings are held on the second Wednesday of every month.
The 2018 dates are listed below. The meeting agenda is posted at the District office.


2018 Calendar

Aug. 8 Sept. 12
Oct. 10 Nov. 14 Dec. 12

Consumer Reports

Below are the yearly Consumer Confidence Reports (in Adobe PDF) as released by the St. Charles Mesa Water District.

2017 2016 2014 2015 2013

 

If you don't have Adobe Acrobat Reader to view the above documents in pdf, you can download it for FREE by clicking the logo below.

  adobe logo

SCMWD Releases

Below are press releases written by St. Charles Mesa Water District (SCMWD) for the media and public consumption.

Prohibition of Use of District Water
(March 21, 2014)

Acceptable Payment

The District is now excepting Credit Card Payments
This is for walk in customers only.

visa mastercard discover logo
The District cannot take a card number over the phone. This is for your security and the Districts