- 7.00 The Connection Charge (Tap Fee).
- The Connection Charge shall be as set from time to time by the Board of Directors and reflected in Appendix F.
- Zone 1: See Appendix F.
- Zone 2: No taps available
- 7.01 The Connection Charge (Tap Fee).
- The Commercial Connection Charge shall be as set from time to time by the Board of Directors and reflected in Appendix F.
Any request for a water tap in excess of 1" must be approved by the Board of Directors after evaluation by the District’s hydraulic model.
- 7.02 Water Connection Charges Prior to May 10, 2006.
- Summary for water connection charges for subdivisions approved prior to May 10, 2006 (See Appendix F).
- 7.03 Meter Flow Standards.
- Meter flows are based on AWWA standards and may vary due to the distribution systems hydraulics.